Demolition Permits in South Florida: Broward, Miami-Dade, Palm Beach and Manatee

Tearing down a house, a garage or a commercial building in South Florida takes more than the building department's demolition permit. The step that surprises most owners is asbestos: a survey before the work and a notice filed at least ten working days ahead, with a wait that cannot be shortened. This guide covers the permit, the asbestos rules, what each county adds, utility disconnects, and what a build-ready lot looks like. Langley Coastal handles demolition and the sitework that follows.

Written by Langley Coastal Construction, Florida general contractor license CGC1538377. Facts are linked to their sources; this is general information, not legal advice.

The demolition permit

Florida Building Code section 105.1 requires a permit to construct, enlarge, alter, repair, move or demolish a building or structure. That covers a house, a detached garage, a commercial building and a swimming pool. [epicwatershapes.com]

The permit comes from the city or county building department with jurisdiction. The City of Miami, for example, requires a demolition permit and states that only a qualified contractor may pull it. [miami.gov]

Palm Beach County's building division publishes a demolition permit policy (PBO-110) that explicitly includes swimming pools along with buildings. [discover.pbcgov.org]

The application is the easy part. What holds it up is the paperwork attached to it: the asbestos documentation described next, letters confirming utilities are disconnected, and often a survey of the lot.

Asbestos survey and the 10-working-day Notice of Demolition

Federal asbestos rules (NESHAP), enforced in Florida by FDEP, require that a thorough inspection for asbestos be conducted before demolition or renovation. A licensed asbestos consultant does the inspection and produces a survey report. [floridadep.gov]

A Notice of Demolition is then filed at least ten working days before work starts. FDEP is direct about the wait: a reduction of the waiting period is not allowed. [floridadep.gov]

The city permit does not count as the notice. Broward's asbestos form states that a city or county demolition or renovation permit does not meet the requirement, and that the notice must be filed at least ten working days in advance. [lauderdalebythesea-fl.gov]

Is a single-family home exempt? Only narrowly. FDEP's FAQ says the residential exclusion applies to a building with four or fewer residential dwelling units that is not part of a larger project. A house taken down for a larger development loses the exclusion. [floridadep.gov]

In practice, South Florida building departments want the survey and the notice receipt regardless, so plan on the survey for every demolition. If it finds asbestos, licensed abatement happens before the excavator arrives.

County by county: Broward, Miami-Dade, Palm Beach, Manatee

Broward. The county's air program handles asbestos compliance. Its form requires the notice at least ten working days in advance, states that a city or county demolition permit does not satisfy it, and requires a Certificate of Submittal before any city in the county issues the demolition permit. [lauderdalebythesea-fl.gov]

Miami-Dade. The county's instructions for the Notice of Demolition require a copy of the asbestos survey report to accompany the completed notice, filed ten working days prior to the work. [miamidade.gov]

Palm Beach. The county building division's demolition policy PBO-110 governs permits in unincorporated Palm Beach County and names pools alongside buildings. [discover.pbcgov.org]

Manatee. The same Florida Building Code permit requirement applies, issued by the county or city building department, and the state asbestos survey and notice rules apply through FDEP. Check FDEP's asbestos program for where the notice is filed for a Manatee County address. [floridadep.gov]

Utility disconnects, the survey and the site

Before a structure comes down, the utilities have to be off and capped: electric, gas, water and sewer. Building departments typically want letters or clearance from each utility with the application. Pool removals carry the same requirement to cap the pool's electrical, gas and plumbing.

A current survey of the lot shows the footprint, easements and setbacks; the demolition plan is drawn on it, and it is the base for the new plans if the lot is being rebuilt.

On the day, the site is fenced, the structure comes down and the debris is separated and hauled. Langley runs demolition with its own equipment, from excavators and land cranes down to mini excavators and skid steers for tight infill lots.

What "build-ready" means, and the sitework after demolition

A demolition is not finished when the building is gone. Build-ready means the foundation and slab are out, not buried; underground utilities are capped and located; a septic tank, if any, is abandoned per the health department's rules; any pool or cistern is removed or filled to spec; and the ground is backfilled in lifts and compacted so the next foundation sits on engineered fill, not a hole full of rubble.

That is where corners get cut. Broken concrete pushed into the hole and covered with sod settles for years. Backfill in lifts, compacted, is what a permit reviewer and a geotechnical engineer will ask about, and it is how Langley leaves every site.

The sitework that follows is a separate scope: clearing, rough grading to drain the lot, bringing in and compacting fill where the new elevation calls for it, and preparing the pad. Langley handles it under one contract with the demolition so the lot goes from occupied to pad-ready without a second mobilization. See sitework.

Fill and grading may carry their own review. A Florida civil engineering firm notes that permits are typically needed when fill exceeds one foot in depth or covers more than 5,000 square feet, or the site is in a regulated flood zone, with a grading plan and a drainage statement demonstrating no adverse off-site impacts. [rspengineers.com]

In Broward, prior to any alteration to the site grading, or construction of a surface water management system, a Broward County Surface Water Management License is required. [broward.org]

What drives cost, and how long it takes

Langley does not publish demolition prices. What moves the number: the size and construction of the building (a concrete-block house with a slab and a pool is more work than a frame garage), what the asbestos survey finds, how much debris has to be hauled, access for equipment, whether a septic tank or a pool is involved, and how much fill and grading the lot needs afterward.

How long it takes has one sourced floor: the asbestos notice must be filed at least ten working days before demolition, and that wait cannot be reduced. [floridadep.gov]

Beyond that, the schedule depends on permit review, abatement if asbestos is found, utility scheduling and the size of the structure; the physical teardown is usually the shortest part. We do not quote a standard number of days because there is no sourced standard.

Questions we hear about this

Do I need an asbestos survey before demolishing a house in Florida?

Almost always. Federal NESHAP rules enforced by FDEP require a thorough inspection for asbestos before demolition or renovation. A narrow residential exclusion covers a building with four or fewer dwelling units that is not part of a larger project, but building departments generally want the survey regardless, and Miami-Dade requires the report attached to the Notice of Demolition. [source]

What is the 10-working-day Notice of Demolition?

A notice filed with the state or county asbestos program at least ten working days before demolition starts. FDEP states that a reduction of the waiting period is not allowed, and Broward's form states that a city or county demolition permit does not meet the requirement. The clock runs from the notice, not the permit, so file it early. [source]

What does a house demolition permit in Broward require?

The city or county building permit under the Florida Building Code, plus Broward's asbestos step: the survey, the Notice of Demolition filed at least ten working days in advance, and a Certificate of Submittal from the county air program, required before any city in Broward issues the permit. Expect utility disconnect letters and a lot survey with the application. [source]

Who pulls the demolition permit, me or the contractor?

The contractor, in most South Florida jurisdictions. The City of Miami states that only a qualified contractor may pull a demolition permit. Langley Coastal Construction, Florida general contractor CGC1538377, pulls the permit, files the asbestos notice and coordinates the utility disconnects as part of the demolition scope. [source]

How long does it take to demolish a house?

The one fixed number is the asbestos notice: at least ten working days before demolition, with no reduction allowed. The rest depends on permit review, abatement if asbestos is found, utility scheduling and the building's size. The physical teardown is usually the shortest part. We do not quote a standard timeline because there is no sourced standard. [source]

What our customers say

Professional and competitively-priced deck construction.
sophia watsonSeptember 2026 · Google review
1 / 3

Talk to a licensed marine contractor

Call (954) 406-0696 or send the form. We serve Palm Beach, Broward, Miami-Dade and Manatee counties.